Receive
Review component dimensions, weight, handling, identification, delivery timing, and coating requirements before shipment.
NORVEX INDUSTRIAL / COATINGS DIVISION
Shop blasting and coating for fabricators, mechanical installers, and contractors. Coordinate incoming material, preparation, application, cure, and release from our East Chicago facility.
RECEIVE. PREPARE. COAT.Review component dimensions, weight, handling, identification, delivery timing, and coating requirements before shipment.
Match blasting and preparation to substrate condition, geometry, specified cleanliness, and surface profile.
Coordinate primer, finish, stripe coats, masking, environmental conditions, inspections, and cure.
Confirm touch-up, identification, handling, loading, and documentation before material leaves the shop.

RAIL DELIVERY + STEEL UNLOADING
Our facility has rail access for steel deliveries and unloading. Coordinate the load and unloading arrangements with Norvex before shipping so the material can move through the planned production sequence.
Send railcar and delivery information, piece marks, dimensions, verified weights, load arrangement, handling requirements and release dates. Unloading equipment, rigging and load-specific capacity are confirmed with Norvex before shipment.
Review rail receiving ↗SHOP CAPABILITIES

Separate surface preparation from the coating that follows.
Explore this scope ↗
Move preparation and coating into the fabrication schedule.
Explore this scope ↗
Our shop has rail access for steel deliveries and unloading.
Explore this scope ↗SPECIFIED PROTECTIVE SYSTEMS
The complete coating package follows the service exposure, project specification and manufacturer requirements.
Organic epoxy zinc-rich primers and inorganic zinc systems where specified, coordinated with compatible intermediate and finish coats.
Specified primers, barrier and high-build coats for fabricated steel, piping and equipment exteriors, with film-build and recoat control.
Approved color and sheen requirements, compatible primers and intermediates, application conditions, and protection during handling.
Tank and component linings, immersion or chemical exposure, and high-temperature or coating-under-insulation systems receive a project-specific review. Product suitability, application requirements, inspection responsibilities and handling arrangements are confirmed before production.
TESTING + QUALITY CONTROL
Blast cleanliness and profile, with dust and soluble-salt checks where required.
Surface temperature, humidity, dew point, mixing, pot life and recoat timing.
Wet- and dry-film thickness, with adhesion or holiday testing where specified.
Cure, touch-up, batch identification, inspection reports and acceptance documentation.
The specification defines acceptance criteria, hold points, test methods and owner or third-party inspection responsibilities. Instruments are verified for the required measurements.
Our quality-control approach ↗SHOP CAPABILITIES / 16 PAGES
Blasting and media review, primers and finish systems, linings, parts and assemblies, rail receiving, material handling, testing, and production control.
YOUR NEXT PROJECT STARTS HERE
Send plans, describe the scope, or request a site visit. Tell us the location, surfaces, and schedule.