UNION CONTRACTOR · CHICAGOLAND + NORTHWEST INDIANAUNION CONTRACTOR(833) 667-8394(312) 676-0960

NORVEX INDUSTRIAL

SAFETY

Ready before mobilization.
Alert through the work.

People, work zones, nearby operations, and the surrounding property are part of the coating plan. Site requirements and task hazards are reviewed before production starts.

SAFETYFIELD. SHOP. COVERED.
01

Plan the task

Review the work location, existing conditions, access, simultaneous work, and the controls the site requires.

  • Pre-task hazard review
  • Defined work areas and access routes
  • Coordination with site leadership
  • Change-of-condition review
02

Protect the work zone

Match protection to the process, neighboring equipment, occupants, and the coating or preparation method.

  • Containment and overspray protection
  • Dust, debris, and runoff planning
  • Ventilation and respiratory requirements
  • PPE and material safety information
03

Control the interfaces

Operating plants and occupied buildings have different constraints. Plan the separation and handoff for each work area.

  • Site permits and isolation requirements
  • Lift, scaffold, and fall-protection review
  • Communication with adjacent trades
  • Housekeeping and area reopening
04

Verify readiness

Confirm the applicable site orientation, workforce requirements, equipment checks, and emergency arrangements for the assigned work.

  • Task-specific training review
  • Client onboarding documentation
  • Field leadership and communication
  • Stop and reassess changed conditions

YOUR NEXT PROJECT STARTS HERE

Let's talk about your next project.

Send plans, describe the scope, or request a site visit. Tell us the location, surfaces, and schedule.