Check the preparation.
Verify the finish.

A coating system depends on the surface beneath it, application conditions, and the checks made along the way. Define required checkpoints before the next stage conceals the work.

QUALITY CONTROLFIELD. SHOP. COVERED.
01

Before application

Review the specified system, substrate, preparation requirements, and approval path.

  • Existing-condition review
  • Surface cleanliness and profile
  • Material identification and shelf life
  • Samples, submittals, and hold points
02

During the work

Follow the project specification and product instructions, with checks suited to the system.

  • Application and environmental conditions
  • Mixing, induction, and pot life
  • Wet- and dry-film thickness when specified
  • Stripe coats and recoat windows
03

Before release

Confirm finish requirements and the point when an area or component can return to use.

  • Cure and handling requirements
  • Specified tests and inspections
  • Coverage, appearance, and touch-up
  • Final punch-list and protection
04

Closeout

Agree on the records the project team needs and organize them with the final handoff.

  • Inspection records required by contract
  • Product and system information
  • Punch-list status and touch-up
  • Turnover and release documentation